Project : Kemalpaşa Natural Gas Combined Cycle Power Plant
Client : Akenerji Elektrik Üretimi Otoprodüktör Grubu A.Ş.
Country : Izmir / Turkey
Project Period : 2004

127 MWa Power plant with two gas and one steam turbines. Gas Turbine area consists of a number of pedestals for different types of mechanical equipment. Steam Turbine is placed in a steel building of 250 ton in weight. The design work includes Electrical Annex Building, Demineralisation Building, Heat Recovery Steam Generator, Air Cooled Condensator, Gas Insulated Substation, Diesel and Water Tanks, Piperacks and cable trenches. Additionally, the road and the drainage design have been prepared.




Other References : 1 2 3 4 5