Airports
Client : CH2M Hill / Dragados / Soluziona Joint Venture / Yuksel Construction Co.
Country : Afghanistan
Project Period : 2009
The scope of work for this project includes the design of following facilities within the Bagram Airbase in Afghanistan: FY-08 Parallel Taxiway Phase 2, FY-08 Strategic Ramp, FY-08 Helo-Apron, FY-09 C-130 Maintenance Hangar, FY-09 Cargo Handling Area Expansion, FY-09 Refueler Ramp with a total paved area of 400,000 sqm. Helicopter Hangar having 94.15m length by 40.75m width and 3,836 m2 of closed area is designed to accomodate two CH47 and one UH60 rotary wing helicopters in 3 bays. Steel building also accomodates office/equipment/storage areas with some very special machinery and 3 ea 10 ton capacity overhead cranes. Dual bay C-130 Maintenance Hangar having 119.15m length by 52.85m width and 6,297 m2 of closed area is designed to accomodate two C-130 Fixed Wing Aircrafts. Steel building also accomodates electrical/mechanical areas with some very special machinery and two 15 ton capacity overhead cranes.